SBI Term Loan: RLLR: 8.15 | 7.25% - 8.45%
Canara Bank: RLLR: 8 | 7.15% - 10%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.3% - 10.7%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 8.75% - 10%
IndusInd Bank: RLLR: -- | 7.5% - 9.75%
Bank of Maharashtra: RLLR: 8.05 | 7.1% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%

Defence ministry to develop Adilabad airport with civil aviation support

#Infrastructure News#Infrastructure#India
Last Updated : 12th Apr, 2026
Synopsis

The Defence Ministry, along with civil aviation authorities and the Telangana government, is moving ahead with plans to develop the long-proposed Adilabad airport as a joint-use facility. The project will allow defence-related training operations to function alongside civilian flight services. A joint inspection of the 300-acre site is scheduled in the coming days, involving all key stakeholders. After the assessment, a detailed project report is expected to be prepared within a few months. The initiative is aimed at improving regional connectivity and supporting infrastructure growth in northern Telangana.

The Defence Ministry is preparing to take forward the development of the proposed Adilabad airport in Telangana, with active support from civil aviation authorities and the state government. The project is being structured as a joint-use airfield that will serve both defence requirements and civilian aviation needs.


Under the proposed plan, the Defence Ministry is expected to operate a training establishment at the airport, while civil aviation authorities will oversee passenger and commercial flight operations. The arrangement is aimed at enabling coordinated use of infrastructure by both defence and civilian aircraft without operational conflict.

Officials have confirmed that a joint inspection of the 300-acre site will take place in the coming days. The inspection will involve representatives from the Defence Ministry, civil aviation authorities, and the Telangana government. The purpose of this exercise is to assess the land conditions, technical feasibility, and suitability for dual-use aviation operations.

Once the inspection is completed, the project will move to the next stage, where a detailed project report will be prepared. This report is expected to be completed within the next two to three months and will guide the final planning and execution framework for the airport.

The Adilabad airport project has been under consideration for a long time as part of efforts to strengthen aviation infrastructure in regions beyond Hyderabad. The current approach places emphasis on improving regional air connectivity while also supporting defence training requirements through shared infrastructure.

The development is also seen as part of broader infrastructure expansion efforts in northern Telangana, with the potential to support local economic activity and improve access to remote districts. The next key steps will depend on the outcomes of the inspection and subsequent approvals required from relevant authorities.

Have something to say? Post your comment