SBI Term Loan: RLLR: 8.15 | 7.25% - 8.45%
Canara Bank: RLLR: 8 | 7.15% - 10%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.3% - 10.7%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 8.75% - 10%
IndusInd Bank: RLLR: -- | 7.5% - 9.75%
Bank of Maharashtra: RLLR: 8.05 | 7.1% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%

Juniper Green to set up 70 MW hybrid renewable project for Tata Power in Maharashtra

#Infrastructure News#Infrastructure#India#Maharashtra
Last Updated : 10th Oct, 2025
Synopsis

Juniper Green Energy has partnered with Tata Power to develop a 70-MW firm and dispatchable renewable energy project in Maharashtra. The facility, combining solar, wind, and battery energy storage, aims to provide reliable power during peak demand and support grid stability. Developed through Juniper Green Sigma Eight Private Limited, the project will have around 180 MWp renewable capacity and 280 MWh of battery storage, with electricity supply expected to begin in September 2027. Juniper Green Energy focuses on utility-scale renewable energy projects across India.

Juniper Green Energy has signed an agreement with Tata Power to set up a 70-MW firm and dispatchable renewable energy (FDRE) project in Maharashtra. FDRE projects integrate advanced solar, wind, and battery energy storage systems (BESS) to provide consistent and reliable power during peak demand periods, strengthening the overall stability of the grid.


Juniper Green Energy, through its subsidiary Juniper Green Sigma Eight Private Limited (Juniper Sigma), has entered into a power purchase agreement with Tata Power for this project. The financial details of the project have not been disclosed. Under the agreement, Juniper Green Energy will handle the development, construction, and operation of the project in Maharashtra.

The FDRE facility is expected to have a total renewable energy capacity of around 180 MWp, supported by approximately 280 MWh of battery energy storage. The combination of solar, wind, and battery storage will ensure that the energy supply remains stable even during peak demand periods or fluctuations in generation from intermittent sources.

Electricity generated from this project will be supplied to Tata Power starting from September 2027. Juniper Green Energy is an independent renewable energy producer in India, focused on utility-scale solar, wind, and hybrid renewable projects. The company has a history of developing, constructing, and operating large-scale renewable energy assets across the country, contributing to India's clean energy transition.

Source PTI

Have something to say? Post your comment